by cedar@naturalchanneldesign.com | Jul 15, 2024 | Bank Sloping, Civil Engineering and Design, Fish Habitat, Stream Channel Restoration, Stream Channel Restoration & Fish Habitat
NCDE designed three projects for NMDGF on Willow Creek from the Ben Lilly Campground downstream to the confluence with Gilita Creek, 11,200 feet of channel, with the goal of improving Gila Trout habitat in this reach. The project utilized rock, logs and local...
by cedar@naturalchanneldesign.com | Nov 27, 2023 | Civil Engineering and Design, Fish Habitat, Stream Channel Restoration, Stream Channel Restoration & Fish Habitat
The purpose of this project is to improve stream stability and aquatic habitat by restoring channel dimensions and installing habitat structures on approximately 1,000 linear feet of the Pecos River at Cowles, NM. The project begins upstream of Winsor Creek and...